New Implementation plan — automated P6 dashboards. Route of the service, USD 200 per man-hour · see the Gantt.

We plan projects as if they were our own.

We combine AWP, 4D BIM (Synchro 4D), Primavera P6, Oracle Primavera Cloud and Artificial Intelligence to bring project planning to a standard that did not exist before in infrastructure, industrial and mining projects worldwide.

"We don't deliver Gantt charts. We deliver execution certainty."

Three pillars of our work

Services designed for infrastructure, industrial and mining projects worldwide.

Planning

AWP, 4D BIM (Synchro 4D), Primavera P6, Oracle Primavera Cloud (OPC) and O3. Schedules that reflect the reality of the field.

Reporting

Automated dashboards on schedule, CapEx and AWP. Executive-grade actionable insights.

Traceability

A continuous line between Estimate, Master Schedule, Hours Budget and Control Schedule.

AWP methodology · 4D / BIM modelling

We build the 4D model on the AWP structure

Advanced Work Packaging gives the project one code — the 3D / BIM model, Primavera P6 and Synchro 4D all read it. The model shows, package by package, what the schedule dates.

CWACWPIWP

AWP

AWP methodology

Work-package structure (CWA, CWP, EWP, IWP), Path of Construction and coding dictionaries, set up on your own activity codes, WBS templates and resource names.

4D

4D / BIM modelling

Model objects linked to coded resources, and resources to schedule activities, so Synchro 4D follows every P6 update instead of being re-linked by hand.

LINK

An auditable link

The link is data: injected into the XER and re-imported, so every object-to-activity link stays traceable.

Linked 4D model + mapping tables

Have a 3D model and a P6 schedule? We link one chain end to end. Talk to us → Read the 4D brief →

The suite · Ten canonical operations

Ten operations, one method

KPI

Schedule Quality

The 14 DCMA checks, weighted, plus deep logic metrics, loop detection and inter-phase traceability.

Health score + the failing activities

CRV

Progress Curves

Planned, earned and forecast physical S-curves straight from the P6 data — no spreadsheet formula drift.

S-curves, duration- or quantity-weighted

MCR

Schedule Risk

CPM Monte Carlo on the real network: probabilistic milestones and critical path.

P10–P95 dates + tornado

REV

Schedule Review

Revision against revision: added, removed and shifted activities, with lost actuals flagged.

Change table Rev A vs Rev B

BAF

Bid & Offer Review

Competing contractor schedules graded on one yardstick — same logic, same denominator.

Ranked, defensible tender scores

GNT

Level 1 & 2 Decks

Executive milestone decks with multi-update overlay, editable by your own team.

PowerPoint, editable shapes

GNT

Gantt & EPS Explorer

Publication-grade interactive Gantt: multi-project navigation, logic tracing, float analysis.

One self-contained HTML file

FCT

Portfolio Forecast

Labour hours or FTE per month for every schedule version in the P6 database — plan, actual, early and late forecast, by area and project.

HH / FTE curves · area › project × version

S4D

AWP & 4D Planning

Schedule-to-model linking in Synchro through coding dictionaries, following the Path of Construction.

Linked 4D model + mapping tables

AIA

AI Adoption

Group Champions model: one AI Champion per planning group prototypes LLM use cases and publishes a governed, token-efficient playbook the rest of the PMO reuses.

.md playbooks · one per group, in 4 weeks

And one standard running through all ten: adherence. Every operation is read against the approved baseline — dates, logic, scope and flow. Not an eleventh service; it is how the ten are done.

What we deliver

From 4D models to executive dashboards — what your team will see in their hands.

Mining concentrator plant under construction with tower cranes — 4D BIM model
4D BIM · Synchro 4D

4D construction model

Mining plant rendered in Synchro 4D, color-coded by construction phase. Used for sequence validation and field interference detection.

Primavera P6 Master Schedule Level 1 with critical path and milestones
Primavera P6

Master Schedule Level 1

Executive view in P6 with critical path, milestones and baselines on a single page.

Automated Performance S-curve report with planned vs actual progress
Automated reports

Performance S-curve

Planned vs Actual progress over time. Cumulative and periodic data, executive-ready.

AI as a partner. Not as a replacement.

We use artificial intelligence to amplify the planner's work — not to replace it.

P6 schedule audits

Automatic detection of logical inconsistencies and abnormal float values across hundreds of activities.

AI-assisted WBS and EWP/CWP

Structures aligned with the AWP framework from day one of the project.

Executive narrative in automated reports

Automated commentary on project data. Goodbye to the monthly copy-paste.

4D + AI

Validation of construction sequences in Synchro 4D, with early detection of field interferences powered by AI.

All under the supervision of planners with real field experience.

How we work

Four clear steps, from diagnosis to ongoing operation.

Diagnosis

Real schedule status. XER audit, critical path analysis and float review.

Design

AWP framework + WBS + 4D model aligned with the project scope.

Implementation

P6, OPC, Synchro 4D, O3 and automated reporting configured and deployed with your team.

Continuous support

Ongoing reporting, monthly adjustments and program improvement cycle.

Implementation plan — automated P6 dashboards

How we deploy automated schedule and CapEx reporting on your Primavera P6 portfolio.

How it lands · Relative weeks from t0, no calendar dates

The route of the service

t0wk 3wk 7wk 13wk 21
0 · Diagnosisdiagnosis reportP6 database access · DCMA-14 gate on every schedule · data-maturity map
1 · Standard designcorporate standard approvedPath of Construction · coding dictionaries · WBS templates · readiness rules
2 · Pilotpilot validated by countingOne chain end-to-end: engineering → procurement → P6 → progress → 4D
3 · Rolloutportfolio under the standardTemplates and scripts per project & contractor · training
4 · Governancepermanent →Recurring gates · constraint & revision reviews · catalog reporting
4D / AWP moduleper projectOptional, per project with a 3D model — same codes
AI Adoption moduleNo fixed bar — scoped per organization. Timing depends on the size and complexity of the organization and the breadth of the AI use cases in scope. It starts whenever the first Group Champion is named: first playbook in four weeks, then one group at a time.

Every phase exits through the same door: the DCMA-14 gate plus evidence validated by counting. Rollout depends on the portfolio; governance is permanent from week 13.

Rate

USD 200 per man-hour.

Budget

The man-hours budget depends on the complexity of the project portfolio and its schedules. We size it after the diagnosis phase. Request an estimate →

Let's talk about your project

Tell us where your project stands and how we can add value from the planning side.